City and County of Denver International Airport (DIA), South Terminal Redevelopment Program, Program Management Consultant Services Contract
The DIA South Terminal Redevelopment Program includes:
- Design and construction for a 500 room hotel and conference center
- RTD’s East Corridor Commuter Rail Transit Station at DIA
- Improvements to the existing concourse baggage and train systems
- An open-air plaza, complete with new concessions and leasable space connecting with the existing Jeppesen Terminal
- Design of a signature rail transit bridge over Peña Boulevard
LS Gallegos as a member of the Program Management Consultant team is providing project controls support including, document control, cost estimating and project administration.
Our on-site document management team is responsible for:
- On-site document control and management assistance for electronic and hard-copy documents
- Conducting on-going user training, and on-going document management and control during design, construction, procurement, testing, and operations start-up
Our on-site cost estimating team is assisting the Program Management Consultant team:
- Prepare project formulation design-to-budget cost estimates
- Prepare design development cost estimates
- Assist with construction contractor change order administration
Our on-site project administration team supports the lead technical and administrative members of the Program Management Consultant team.